If this is your first visit, be sure to
check out the FAQ by clicking the
link above. You may have to register
before you can post: click the register link above to proceed. To start viewing messages,
select the forum that you want to visit from the selection below.
In due time, i want a clean build, i'm debating drilling the back of the stand or the top rear for the drains. if i do the top, i will have to do some crazy plumbing.
most systems have wires and pipes everywhere. i want to have mines nice and clean. will post picks of where i am at later today.
behind the tank, only wish i was more clear about the dimensions, i should have said inner dimensions to be 2ft, this way the plumbing would have went straight down. but i made it work: 1177803813_NKuJ5-M.jpg
Thanks!, how much that little box i asked you about going to cost me? was even thinking of having you build me a simple L shape to attach to the side , to become a desk. 2x2x2 i think it was on the box. stong enough to sit on. so maybe frame with skin. and of course vent for chiller.
pm me price.
Comment